2011-
|
Statoil
|
Smørbukk Sør Extension Project. Conceptual Study. Fast Track Project
|
|
2011-
|
Statoil
|
Visund Nord Subsea Conceptual/FEED Study. Fast Track Project
|
|
2011-
|
Statoil
|
Vilje Sør Subsea Conceptual Study. Fast Track Project
|
|
2011-
|
Det Norske
|
Jette Routing, Seabed survey scope preparation and follow up
|
|
2011
|
Confidential
|
Technical Due Diligence of Pipeline Systems
|
|
2011-
|
Statoil
|
Valemon Pipelines Detail Design
|
|
2011-
|
ConocoPhillips
|
Ekofisk 2/4 V/B Subsea and Pipelines Detail Design
|
|
2010-
|
Statoil
|
Gygrid (Hyme) Pipelines Conceptual/FEED/Detail design Fast Track Project
|
|
2010
|
ConocoPhillips
|
B11 Bypass Study
|
|
2010
|
Total
|
David Subsea Conceptual Study
|
|
2010
|
Talisman
|
Blane Pig Launcher/Receiver Detail Design
|
|
2010
|
ConocoPhillips
|
SSIV Preparedness Support
|
|
2010-
|
Statoil
|
Pan Pandora (Visund Sør) Combined Conceptual and FEED Study. Detail design ongoing. Fast track project
|
|
2010-
|
Technip Norge
|
Smørbukk PIP Project. Detail Engineering
|
|
2009-
|
Technip Norge
|
Oselvar PIP Design, Fabrication and Installation Verification/Certification Contract
|
|
2009-10
|
Total
|
Hild Subsea Conceptual Study
|
|
2009
|
Statoil
|
Trawl Assessment Screening Study
|
|
2009
|
StatoilHydro
|
Damage Assessment Kvitebjørn gas pipeline
|
|
2009
|
BP
|
HOD Flexible Pipeline Life Extension Project
|
|
2009
|
StatoilHydro
|
Haltenpipe Free Span Assessment
|
|
2009
|
StatoilHydro
|
Gjøa Cable FEED Design & Engineering Services
|
|
2009
|
StatoilHydro
|
Kvitebjørn Oil Pipeline Study. Detailed gravel infill design related to free spans violating the free span criteria
|
|
2009
|
SDAG
|
Shtokman Pipeline Engineering Services (Flowlines)
|
|
2009
|
Lyse
|
Risavika LNG pipeline Detail design
|
|
2009
|
StatoilHydro
|
Kristin Q and K Project – FEED Study
|
|
2009
|
Gassco
|
CO2 Transportation Network – FEED
|
|
2009
|
StatoilHydro
|
Snorre Future Pipelines FEED
|
|
2008-2009
|
Gassco
|
Skanled Pre-engineering
|
|
2005 – 2008
|
StatoilHydro
|
Tyrihans Detailed design. In cooperation with Rambøll and Nemo performing the detailed design of the 16”/18” production line, 10” gas inj. Line and umbilical and 3” MEG line.
|
|
2008
|
Gassco
|
Gas to Pierce Conceptual Study
|
|
2008
|
SF Gass
|
Sløvåg 8” Branch Pipeline, Detail Engineering
|
|
2008
|
StatoilHydro
|
Visund Conceptual Flowline Study
|
|
2008
|
Gassco
|
CO2 Transportation Network Conceptual Engineerng
|
|
2008
|
StatoilHydro
|
Gudrun Conceptual Pipeline Study
|
|
2008
|
StatoilHydro
|
Snorre Future Pipeline Conceptual Study
|
|
2007/08
|
ENI
|
Goliat Field Layout Verification Study
|
|
2007/08
|
Statoil
|
Gjøa Pipelines Detail design in cooperation with Rambøll and Nemo
|
|
2007
|
Altinex
|
Failure investigation of water injection line
|
|
2007/08
|
Statoil
|
Kvitebjørn Oljerør Upgrade Study
|
|
2007
|
BP
|
Valhall Flank De-bottlenecking Costing study
|
|
2007/08
|
Gassco
|
CO2 pipeline transportation conceptual engineering
|
|
2007
|
SF Gass
|
Detail Design of 8” branch line to Sløvåg
|
|
2007
|
Vetco
|
Kizomba: Stress analysis of 59 vertical tie-in spools/jumpers
|
|
2007
|
BP
|
UTS/Gyda Crossing evaluation
|
|
2007
|
Talisman
|
Oselvar tie-in to Gyda study
|
|
2007
|
Statoil
|
Gjøa cable routing, installation and free span study
|
|
2007
|
Gassco
|
CO2 pipeline transportation feasibility study
|
|
2006/7
|
Statoil
|
Vigdis WI, Detailed design of 16” x 9km water injection pipeline. Residual curvature/ plastic lined pipeline
|
|
2006
|
Statoil
|
Åsgard Minimum Flow study.
|
|
2006
|
Statoil
|
Colette/Yttergryta FEED.
|
|
2006
|
Total
|
Hild Field Development Study
|
|
2006
|
BP
|
Ula – Statpipe gas pipeline Conceptual Study.
|
|
2006
|
Statoil
|
Vigdis Water Injection FEED
|
|
2006
|
BP
|
Valhall Flank Detail design. Detailed design of 2 x 12” production flowlines and 2 x 8” gas injection pipelines.
|
|
2005/06
|
Statoil
|
Åsgard Subsea Project
|
|
2005
|
BP
|
Valhall Flanke De-bottlenecking project
|
|
2005
|
BP
|
4” Hod gas failure assessment
|
|
2005
|
Gassco
|
Zeepipe IIA – Heimdal RP Crossover Pipeline Study
|
|
2005
|
Gassco
|
Sleipner – Draupner Reinforcement Study
|
|
2005
|
Sarawak Shell Berhad
|
Pre-Engineering of G7 and M3S flowlines
|
|
2005/06
|
Statoil
|
Tampen Link Detailed design of 10” riser, 32” gas pipeline and inline Tee
|
|
2004
|
BP/Gassco
|
HNO – Tampen Export Pipeline Conceptual Design
|
|
2004
|
Statoil/Gassco
|
Troll Phase 3 Feasibility Study
|
|
2004
|
Statoil/Gassco
|
Åsgard Transport Looping Study
|
|
2004
|
Statoil
|
Statfjord Late Life Conceptual and Pre-Engineering
|
|
2004/05
|
Sarawak Shell Berhad
|
14” B12 Conceptual and detail design
|
|
2004
|
ExxonMobil
|
Inspection planning and result evaluation for Jotun, Balder and Ringhorne subsea systems
|
|
2004
|
Statoil
|
Åsgard Transport Upgrade Design (with Kristin gas)
|
|
2003-2004
|
Statoil
|
2 x 10” Åsgard Q Flowlines Detailed Design
|
|
2003
|
Statoil
|
Norne Satellites Pipeline Conceptual Study
|
|
2003
|
Sarawak Shell Berhad
|
14” Serai and 24” Jintan Lateral Buckling and axial creep design
|
|
2003
|
Subsea7
|
Halfdan Spools and risers installation design
|
|
2003
|
Statoil
|
Tyrihans Pipelines Conceptual Engineering
|
|
2001/2003
|
Statoil
|
Kvitebjørn pipelines Detailed design
|
|
2002
|
BP
|
Valhall Flanke Verification Activities
|
|
2002
|
Statoil
|
South Pars Field Development Study
|
|
2001
|
BP
|
Ula To Forties – Pipeline Conceptual design
|
|
2001
|
ABB Lummus Global
|
Khuff Gas Export to Habshan FEED and detailed design
|
|
2001
|
BP
|
Thermal Buckling Demonstration Analysis
|
|
2001/2002
|
NIOC
|
Foroozan Pipeline Conceptual Study
|
|
1998 to 2000
|
Statoil
|
Norne / Heidrun Pipelines Detailed Design
|
|
1996 to 2000
|
Statoil
|
42” Åsgard Transport Gas Export Pipeline – detailed design
|
|
1995 to 2000
|
Statoil
|
Asgard Infield Flowlines – detailed design
|
|
1999
|
A/S Norske Shell
|
Draugen Gas Export Pipeline (DGEP) Project
|
|
1999
|
Coflexip Stena Offshore
|
Loke to Sleipner New Pipeline
|
|
1999
|
Norsk Hydro
|
Tune Flowlines
|
|
1999
|
Elf Exploration Angola/ABB
|
Dalia Development, Angola
|
|
1999
|
Confidential
|
Flowline cost study
|
|
1998
|
Norsk Hydro
|
Tune Flowline Upheaval Buckling Study
|
|
1998
|
Olje og Energi Dep.
|
Re-use of Pipelines
|